Recent International Projects

Dolphin Project

In 2005 Van Oord was awarded several contracts as part of the Dolphin gas project in the Persian Gulf.

A. Lamb Associates Ltd supported this project through the key commercial phase.

The Dolphin project entails the production and processing of natural gas from Qatar's North Field, and transportation of the dry gas by pipeline to the UAE. For this purpose, two 80km sea lines to an onshore processing plant in Ras Laffan (Qatar) and a 370km export line from this plant to Taweelah (UAE) need to be constructed. The offshore pipelines will be installed by Saipem from Italy.

For the shore approach of the Ras Laffan pipelines, Van Oord is subcontracted to excavate a 1500m trench as well as the pull to shore of the two 36 inch sea lines and one 48 inch export pipeline using two linear winches. At Taweelah, Van Oord is subcontracted to excavate a 5100m trench as well as the pull to shore of the 48 inch export pipeline.

Both trenches will be excavated using cutter suction and backhoe dredgers. Upon completion of the pipeline installation, the trenches will be backfilled using previously excavated material and engineered backfill material.

Van Oord will also be responsible for the installation of more than 200,000 tonnes of graded rock at different locations along the route of the sea lines and export line. These works are required for protection of crossings with existing facilities and stabilisation and freespan rectification of the offshore pipelines. The rock to be used will be produced in Qatar and transported from the Ras Laffan Port on a rock barge to the pipeline. The rock will be installed using a side stone dumping vessel.

When finished in 2007, 2 billion cubic feet of natural gas per day will initially be transported through the pipeline. The pipeline's design capacity allows for throughput to eventually rise to 3.2 billion cubic feet of natural gas per day.

A. Lamb Associates -
growth through results.

 


 
  sea A Lamb Associatesjungle site  

 

A. Lamb Associates - continuing to deliver.

 

"20 years of experience & tomorrow's technique's"

 

"Planning and Quantum Experts"

 

"Leading Industry Professionals"

 

"International Experience"

 

"Flexible Fees"

 

"History of Positive Outcomes"

 

A. Lamb Associates - Results Driven Service

 


 
 

Managed website and hosting by Reyaltec Ltd
All content © A. Lamb Associates Ltd
Construction Consultants and Quantity Surveyors
Recent International Projects